Thread Content
Call for Bids for Maintenance and Repair Services for Soken High-Voltage Soft Starter Control System and Enke High-Voltage Inverters at the Coal-to-Oil Company Author/Source: Date: 2022-07-05 Clicks: 5 1. Bidding Conditions The title of this bidding project is: Public Bid for Maintenance and Repair Services for Soken High-Voltage Soft Starter Control System and Enke High-Voltage Inverters at the Coal-to-Oil Company. *The bidder is the Ordos Coal-to-Oil Branch of China Shenhua Coal-to-Oil Chemical Co., Ltd.; the project owner is also the Ordos Coal-to-Oil Branch of China Shenhua Coal-to-Oil Chemical Co., Ltd., and the funding for this project comes from internal resources*. This project meets the requirements for bidding, and public bidding for domestic qualification review is now being conducted for this project. 2. Project Overview and Scope of Bidding 2.1 Project overview, scope of bidding, and division into bid sections (packages): This project is divided into only one bid section. The Ordos Coal-to-Oil Branch of China Shenhua Coal-to-Oil Chemical Co., Ltd. is located in Shangwan, Yicheng District, Ordos City. It is the world’s first commercial plant for coal direct liquefaction on a scale of one million tons per year, and it was one of the key projects during the 10th Five-Year Plan period. Direct coal liquefaction involves using a direct coal liquefaction process with entirely independent intellectual property rights. Starting from coal, and employing nanoscale catalysts developed jointly by Shenhua and the China Coal Research Institute as part of the **\"863\" Program**, clean petroleum products are produced through high-temperature and high-pressure liquefaction reactions as well as subsequent processing steps, with the help of hydrogen-containing solvents. The initial investment for the project is 15 billion yuan, with a designed annual oil production capacity of 1.08 million tons. Scope of the tender: Responsible for the maintenance and repair of the Sokken high-voltage soft start control system and the Enkeo high-voltage frequency converters at Shenhua Ordos Coal-to-Oil Company (including periodic inspection and maintenance, as well as fault repairs). 2.2 Others: The service period for this project is three years from the date of contract signing. 3. Qualification requirements for bidders 3.1 Qualification conditions and performance requirements: [1] Qualification requirements: (1) The bidder must be an independently registered legal entity or other organization, and must provide valid certification documents ; 【2】Financial requirements: / 【3】Performance requirements: / 【4】Reputation requirements: / 【5】Qualifications required for the project leader: / 【6】Requirements for other key personnel: / 【7】Equipment requirements: / 【8】Other requirements: (1) The bidder must have a valid authorization from the Israeli company SOLCON for the maintenance (or repair or technical services) of high-voltage soft starter systems, and must provide a scanned copy of such authorization document. (2) The bidder shall possess a valid authorization from Enke Technology Co., Ltd. for the maintenance (or repair or technical services) of high-voltage frequency converters, and shall provide a scanned copy of the authorization document. Note: The qualifications and performance of parent and subsidiary companies cannot be borrowed from each other. 3.2 Joint bids are not accepted for this project. 4. Acquisition of tender documents *The purchase of tender documents begins on 2022-07-04 at 14:00:00, and the deadline for purchasing them is 2022-07-11 at 16:30:00. *The price per set of tender documents for each bid section (package) is 1,000.0 RMB for Bid Section (Package) 1; no refund will be provided after purchase.