HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Announcement for the project of water supply and drainage pipelines (along with related civil engineering works) for the industrial demonstration project on the development of a new 3,000-ton-per-day OMB powder coal gasification technology by Company 14 of Sihua Jian Si and Yankuang Lunan Chemical Industry

2022-06-28View Original

Thread Content

Announcement for the Project of Water Supply and Drainage Pipelines (and Related Civil Works) for the 3,000-ton-per-day OMB New Type Powder Coal Gasification Technology R&D Industrial Demonstration Project by Company No. 4 of China National Chemical Engineering Group Corporation – Yankuang Lunan Chemical Industry. Author/Source: Date: 2022-06-27 Clicks: 26 1. Bidding Conditions: Company No. 4 of China National Chemical Engineering Group Corporation is responsible for the 3,000-ton-per-day OMB New Type Powder Coal Gasification Technology R&D Industrial Demonstration Project at Yankuang Lunan Chemical Industry; the funding for this project has been secured, and the conditions for bidding on the project related to water supply and drainage pipelines (and related civil works) are now met*. The tenderer is the Fourth Engineering Company, and a public tender is now being conducted. 2. Project Overview and Bidding Details 2.1 Project Overview and Bidding Details (1). Bid Section (Package) Number: * Bid Section (Package) Name: Shisi Hua Jian No.4 Company – Yankuang Lunan Chemical’s 3,000-ton-per-day OMB new type of pulverized coal gasification technology R&D industrial demonstration project: overall water supply and drainage pipelines (along with related civil works) – Bid Package 01. Bidding Content and Scope: The overall water supply and drainage pipelines (along with related civil works) for Yankuang Lunan Chemical’s 3,000-ton-per-day OMB new type of pulverized coal gasification technology R&D industrial demonstration project, as well as the renovation and demolition of existing facilities in the old factory area. The length of the underground pipe is approximately 5,600 meters. 2.2 Planned construction period: 150 days. 2.3 Construction location: Within the premises of Yunchuan Lunan Chemical Co., Ltd. 2.4 Requirements for construction quality and safety: The construction quality must meet **quality standards, while construction safety must comply with **construction project safety standards. 2.5 Others: None 3. Qualification requirements for bidders 3.1 Qualification requirements for bidders 1. Potential bidders must be on the approved shortlist of subcontractors for the projects of China Chemical Engineering Tenth Fourth Construction Co., Ltd. 2. Meet the qualification requirements related to the project. 3.2 The bidder shall not be in any of the following situations: (1) Having the same person as the person in charge of another bidder for this project. (2) There is a direct controlling relationship with other bidders for this project. (3) Having a management relationship with other bidders for this project. (4) There have been the following serious adverse circumstances in business operations over the past three years: ① Being suspended, disqualified from bidding, or prohibited from participating in tendering activities by the industry regulatory authorities at or above the provincial level where this project is located, in accordance with the law. ②It is in a state where it has been ordered to suspend operations, have its license temporarily seized or revoked, its permits temporarily seized or revoked, or its qualification certificates revoked. ③Entering liquidation proceedings, being declared bankrupt, or encountering other circumstances that result in an inability to fulfill obligations. ④In accordance with the company’s requirements for bidder management, those who are prohibited from participating in bidding activities and whose prohibition is still in effect. 3.3 Whether the project accepts consortia: Accept / Reject. The parties involved in a consortium shall, in accordance with their division of responsibilities as stipulated in the agreement, meet the corresponding conditions and requirements set out in paragraph 3.1 of this article ; None of the parties to the consortium shall be in the situation specified in paragraph 3.2 of this article ; None of the parties in the consortium shall submit a bid on its own behalf, nor shall it participate in the bidding process for this project as part of another consortium. Otherwise, all relevant tender documents shall be deemed invalid. 4.*Registration period: From 09:00 on June 25, 2022, to 16:00 on June 28, 2022 (Beijing time)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.