HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Yan’an Energy Chemical Gasification and Purification Center of Yanchang Petroleum: Striving to Meet Annual Production Targets

2022-12-07View Original

Thread Content

Yan’an Energy Chemical Gasification and Purification Center of Yanchang Petroleum: Striving to Meet Annual Production Targets Author/Source: Yan’an Energy Chemical of Yanchang Petroleum Date: 2022-12-06 Clicks: 14 As the end of the year approaches, the Gasification and Purification Center of Yan’an Energy Chemical under Yanchang Petroleum is focused on meeting its annual production targets, working at full speed to catch up on production tasks and making every effort to fulfill these targets. As of December 4, a total of 1,480.65 billion standard cubic meters of coal-based syngas had been produced throughout the year, achieving 96.46% of the annual target. Over the past few days, the center has earnestly learned from the recent domestic safety production accidents, aimed at achieving the \"three zeros\" goal in safety production, and carried out systematic efforts to address safety issues by handling them on a daily basis and making progress on a weekly basis, while also focusing heavily on the identification and resolution of potential hazards ; Strengthen winter safety production management, increase the inspection and maintenance of dynamic and static equipment in the plant, to ensure its safe and stable operation ; Two online furnace transfers were completed successfully, and the hydrogen-to-carbon ratio of the coal-based syngas was adjusted in a timely manner in coordination with downstream units, ensuring that the gasification unit could operate at full capacity in cold weather ; Continuous optimization of PID parameter tuning has increased the automation utilization rate of the instruments in various units to over 96%, effectively reducing the number of alarms in these units as well as the need for operator intervention, thereby improving the stability of the units ; Three degassing water pumps were successfully modified by installing drain pipes at their 6 inlet filters, which effectively solved the problem of water accumulation and freezing on the floor during filter cleaning, thus laying a foundation for the safe operation of the facility in winter.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.