Electrical Technology Daily Question 2018.11.25

2018-11-25View Original

Thread Content

Exam Paper on Electrical Safety Procedures: Before the maintenance work is completed, if it is necessary to apply test voltage to the equipment, this should be done under the following conditions: A: All workers must leave the work area. B: All work orders related to that system must be collected. C: The warning signs must be removed and the normal barriers must be reinstalled. D: After a thorough inspection by the person in charge of the work, the operation staff may then carry out the voltage testing. E: After a thorough inspection by both the person in charge of the work and the operation staff, the operation staff may then carry out the voltage testing. F: Remove the temporary barriers, grounding wires, and signboards, and restore the permanent barriers. Answer: ABEF
Reply #22018-11-25
E: After a thorough inspection by the person in charge of the work and the operators confirms there are no issues, the operators carry out the pressure testing.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.