HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Electrical Technology 2020-6-29

2020-06-29View Original

Thread Content

This post was last edited by sdscj0122 on 2020-7-1 10:02. It contains true/false questions based on the \"Electrical Safety Work Procedures.\" Please indicate whether the answer is correct or incorrect; 3 points are awarded for correct answers and 2 points for incorrect ones. A detailed explanation of the reason is required. 81. If the equipment is at the same voltage level, located on the same floor, and power is to be turned off or on simultaneously, and it is possible to avoid coming into contact with live conductors, then it is permissible to use one work order for several electrical connections. However, all safety measures specified in the work order must be carried out at once before starting work. ( ) Correct

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.