Should water flushing come before nitrogen purging or vice versa?

2017-10-05View Original

Thread Content

A young chemical engineer seeking advice from experts: which step should be taken first? What needs attention here?
Reply #22017-10-06
Washing with water first. Be careful to remove the flow meters and automatic control valves and replace them with bypasses to prevent damage to the instruments.
Reply #32017-10-06
Rinse with water first, then blow it away with air. Tubes with a larger diameter need to be purged under pressure.
Reply #42017-10-06
If both water flushing and nitrogen purging are required, water flushing is usually done first (to remove debris, dust, etc.), followed by nitrogen purging (to remove water). For some pipelines, either only water flushing or only nitrogen purging is sufficient~~
Reply #52017-10-12
Wash with water first, then purge with nitrogen. Ordinary factories are not so extravagant; they use water washing followed by air blowing, and before testing, they employ nitrogen blowing for purging

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.