HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Hydrocracking products

2020-04-29View Original

Thread Content

When do hydrocracking products fall below the acceptable standards? Please teach me, experienced master.
Reply #22020-04-30
When the sample test fails, the start/stop period is also changed to the failure line
Reply #32020-05-04
You didn’t do any tests? No metrics? Of course, it’s not absolute all the time, because some products can be blended. . . And also when the device experiences abnormalities for an extended period of time.
Reply #42020-05-06
It happens when the product’s specifications are not met; in special situations such as power fluctuations, the furnace failing to start or going out, etc. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.