HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Q&A Question 257】2018.09.20

2018-09-20View Original

Thread Content

【Q&A Question 257】September 20, 2018: Briefly describe what happens to the device’s heating furnace after the system passes the hydrostatic test. Which other items must also meet the requirements? The furnace walls and linings must be in good condition ; The furnace has no air leaks ; The furnace wall does not overheat ; The burner is burning well ; Good insulation and paint condition ; The cleanup at the maintenance site meets the requirements ; The attached components are flexible and reliable ; In normal operation. (Unless otherwise specified, all questions and answers are based on hydrogenation units.) ) Correct: 3 wealth, Incorrect: 1 wealth ; Mass posting of posts – rated based on the lowest score ; Replies that are unrelated to the answer are considered spam and will be deleted immediately. For management purposes, if you need to view content from a few days ago, please go to https://bbs.hcbbs.com/home.php?mod=space&uid=3862647&do=thread&view=me&from=space through the summary post below
Reply #22018-09-20
The furnace wall and lining are in good condition; The furnace has no air leaks ; The furnace wall does not overheat ; The burner is burning well ; Good insulation and paint condition ; The cleanup at the maintenance site meets the requirements ; The attached components are flexible and reliable ; In normal operation.
Reply #32018-09-20
The furnace wall and lining are in good condition; The furnace has no air leaks ; The furnace wall does not overheat ; The burner is burning well ; Good insulation and paint condition ; The cleanup at the maintenance site meets the requirements ; The attached components are flexible and reliable ; In normal operation.
Reply #42018-09-20
The furnace wall and lining are in good condition; The furnace has no air leaks ; The furnace wall does not overheat ; The burner is burning well ; Good insulation and paint condition ; The cleanup at the maintenance site meets the requirements ; The attached components are flexible and reliable ; In normal operation.
Reply #52018-09-20
The furnace wall and lining are in good condition; The furnace has no air leaks ; The furnace wall does not overheat ; The burner is burning well ; Good insulation and paint condition ; The cleanup at the maintenance site meets the requirements ; The attached components are flexible and reliable ; In normal operation.
Reply #62018-09-20
The furnace wall and lining are in good condition; The furnace has no air leaks ; The furnace wall does not overheat ; The burner is burning well ; Good insulation and paint condition ; The cleanup at the maintenance site meets the requirements ; The attached components are flexible and reliable ; In normal operation
Reply #72018-09-20
The furnace wall and lining are in good condition; The furnace has no air leaks ; The furnace wall does not overheat ; The burner is burning well ; Good insulation and paint condition ; The cleanup at the maintenance site meets the requirements ; The attached components are flexible and reliable ; In normal operation.
Reply #82018-09-20
The furnace wall and lining are in good condition; The furnace has no air leaks ; The furnace wall does not overheat ; The burner is burning well ; Good insulation and paint condition ; The cleanup at the maintenance site meets the requirements ; The attached components are flexible and reliable ; In normal operation.
Reply #92018-09-20
The furnace wall and lining are in good condition; The furnace has no air leaks ; The furnace wall does not overheat ; The burner is burning well ; Good insulation and paint condition ; The cleanup at the maintenance site meets the requirements ; The attached components are flexible and reliable ; In normal operation
Reply #102018-09-20
The furnace wall and lining are in good condition; The furnace has no air leaks ; The furnace wall does not overheat ; The burner is burning well ; Good insulation and paint condition ; The cleanup at the maintenance site meets the requirements ; The attached components are flexible and reliable ; In normal operation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.