HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problems with PSA operation

2018-10-22View Original

Thread Content

Our facility has 12 PSA towers, and one operating cycle consists of 24 steps. I would like to ask: if the setting for T1/T2 is 40 seconds, how long does one operating cycle take? How is this calculated?
Reply #22018-11-09
12*(T1+T2), I guess
Reply #32018-12-11
The time it takes for an adsorption tower to go from one state (such as the adsorption state) through various other states (such as pressure equalization, forward desorption, reverse desorption, purging, pressure equalization again, and final pressure increase) before returning to this initial state (i.e., adsorption) is what is commonly referred to as the operating cycle (which can be thought of as moving 360 degrees around a circle, starting from 0 and ending back at 0). Based on the information provided by the poster, its cycle time is 12*(T1+T2) = 960 seconds.
Reply #42018-12-12
(40+40)*12=960s

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.