What is the procedure for engineering liaison forms?

2017-09-18View Original

Thread Content

Hello, everyone from CNOOC. We are the general contractor in charge of a certain project, and the project uses SH3503 as the form for engineering communications. So, regarding the engineering communication forms submitted by the construction unit, what procedures should we follow? Are signatures from the supervisor and the owner required? It would be great if someone could upload a template; thank you all
Reply #22017-09-18
For engineering liaison notes, first determine what the issue is, then decide who to send them to. After receiving a response, check which units need to sign off on them; once everything has been approved, just archive them
Reply #32017-09-21
The issues are finalized through signatures by all three parties: the owner, the contractor, and the supervisor. Any changes need to be approved by the design institute before drawings can be prepared for construction

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.