The company’s new project has begun construction, at the public service center

2018-01-20View Original

Thread Content

The company’s new project has begun construction. 1. Installation of instrumentation equipment in the public auxiliary center; 2. Statistical installation of instrument cables and cable trays (if the DCS systems in workshops A and B are shared, with A having a DCS system while B does not, how should the instrument cable trays be routed from B to the DCS system in A?) ; 3. Inventory of motor power cables and control cables and their installation: It is urgent to determine who should be responsible for addressing these 3 issues.
Reply #22018-01-20
These tasks should be reported to the boss, and whoever the boss assigns to do them will carry out the task
Reply #32018-01-20
Generally, the design of new projects is entrusted to design institutes, while the construction is carried out by construction companies; But based on what the original poster said, it doesn’t seem like it’s an outsourced task; if the design and construction are done in-house, it depends on the company’s internal structure. If the company has its own design department, it’s better to let that department handle the design work. If there is no such department, then each specialty must carry out the design work on its own. There are also many different units responsible for the design and construction of those three aspects mentioned above.
Reply #42018-01-21
If the public service center is constructed under a general contract, the general contractor shall be responsible; If civil work and installation are contracted separately, the installation contractor is responsible (subject to the scope of the installation contract).
Reply #52018-01-21
2. Statistical installation of instrument cables and cable trays (if the DCS systems in workshops A and B are shared, with A having a DCS system while B does not, how should the instrument cable trays be routed from B to the DCS system in A?); ----Check how the scope of the installation contract is defined; if it is vague, it is necessary to clarify matters with the installation company. Generally, the cable tray is taken as a boundary point one meter outside the BL line in the workshop to determine the scope of responsibilities between the equipment and the auxiliary services center; as for instrument cables, the area from the auxiliary services center to the equipment cabinets falls under the responsibility of the installation unit at the auxiliary services center.
Reply #62018-01-21
This, during the installation bidding process, is a contract for pipeline installation

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.