Should the trial operation plan for the facility be prepared by the owner or by the general contractor?

2018-04-14View Original

Thread Content

Should the trial operation plan for the facility be prepared by the owner or by the general contractor?
Reply #22018-04-15
This must be checked against the contract terms, and implemented strictly in accordance with them.
Reply #32018-04-15
The EPC TurnKey contract is prepared by the contractor. The EPC contract is prepared by the owner, with the contractor’s cooperation.
Reply #42018-04-16
Normally, a trial operation plan is prepared, and ultimately the owner selects the best plan based on the results of the completion inspection.
Reply #52018-04-16
The completion acceptance procedures had not been carried out during the trial operation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.