HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is it necessary to remove the isolation valve (fire isolation valve) for pipeline water flushing?

2018-07-17View Original

Thread Content

Is it necessary to remove the isolation valve (fire isolation valve, UV valve) before flushing the pipeline with water?
Reply #22018-07-17
I think it should be removed to prevent debris in the pipes from damaging the valve core. Generally, during initial startup purging and flushing operations, flow meters, orifice plates, and control valves need to be removed to prevent damage.
Reply #32018-07-20
Those with a larger diameter are also acceptable; generally, we don’t disassemble those with a DN of 200 or higher, while for those with a diameter of less than 200, we use bypass connections.
Reply #42018-07-20
Those with a larger diameter are also acceptable; generally, we don’t disassemble those with a DN of 200 or higher, while for those with a diameter of less than 200, we use bypass connections.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.