HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Storage and Transportation Operations (2018.8.30)

2018-08-30View Original

Thread Content

Continue studying *Light Oil Guidelines*: Setting height for low-liquid-level alarm: For tanks with fixed roofs, it should be the top height of the inlet line plus 610 mm; For floating roof tanks and internal floating roof tanks, the support height of the floating boat is +200 mm (to ensure that the vent holes on the floating disk are closed). At the same time, it should meet the requirements of ( ). The answer can be found here: The pump will not get empty
Reply #22018-08-30
The pump will not become empty within 10–15 minutes after the alarm is triggered
Reply #32018-08-30
Requirement that the pump shall not be emptied within 10–15 minutes after the alarm is triggered
Reply #42018-08-30
The pump will not become empty within 10-15 minutes after the alarm is triggered

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.