Regarding the discharge or waste outlet ports of the measurement pipeline

2021-04-06View Original

Thread Content

Do the discharge or waste ports of the measurement pipeline need to be fitted with plugs? Another group of experts has put forward suggestions for improvement; I’d like to ask the experts here which standard this refers to
Reply #22021-04-06
There are root valves, as well as double needle valves. There are already 3 manual valves in total, and the expert team also requested that wire plugs be added to the waste discharge outlets :(
Reply #32021-04-06
Of course, valves or plugs must be added; how can there be uncontrolled discharge?
Reply #42021-04-06
Article 7.2.8 of GB50160
Reply #52021-04-06
Is this specification suitable for the site you mentioned?
Reply #62021-04-07
GB50160 7.2.8 applies to \"continuously operated combustible gas pipelines\" and is clearly not suitable for this case.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.