HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the status of the blind flanges in the blind flange location diagram on the blind flange ticket

2021-08-28View Original

Thread Content

For example, if I need to install a blind flange, I have to obtain a blind flange permit, and that permit must include a diagram showing the location of the blind flange. So when drawing this blind flange, should I depict it in its closed position or in its open position? Some colleagues believe it should be shown as a blind plug; the blind plug shown in the blind plug diagram represents the actual status of the blind plug at present ; Some colleagues think it should be drawn as an open position; the blind plate in the blind plate legend represents the operational outcome I aim to achieve ; Since we can’t reach a consensus now, and after checking the relevant specifications for blind plates, no specific rules were found, I would like to ask everyone what exactly should be drawn
Reply #22021-08-28
Appendix to GB30871-2014: Blind Flange Opening and Closing Work Ticket; Blind plate location diagram: show the status that will exist after this operation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.