HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Do the power cables connected to the new UPS cabinet need phase verification?

2021-12-04View Original

Thread Content

Since both transformers in the workshop are to be overhauled and power needs to be cut off, the UPS cabinet in the control room needs to be powered by three-phase electricity from another workshop in order to keep it functioning. After I turn off the transformers and the UPS starts working, I will then connect the power cable from the other workshop to the UPS cabinet. Do I need to check the phase alignment before making this connection?
Reply #22021-12-09
Reply to yourself; experience has shown that verification is required\ud83d\ude02

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.