List of violations in the construction industry: foundation pit support
Thread Content
1. No support scheme for foundation construction.2. The construction plan lacks specificity and cannot guide actual construction.
3. No specialized support design provided for excavations deeper than 5 meters.
4. The support design plan has not been approved.
5. The design plan for excavations deeper than 5 meters has not undergone expert review.
6. No safety measures are in place to protect the edges of the excavation site.
7. The actual implementation of the support measures does not comply with the plan requirements.
8. No effective drainage measures have been taken during excavation.
9. The distance between machinery/equipment and the edge of the pit does not meet specifications.
10. There is no dedicated safe passage for personnel to enter or exit the excavation site.
11. The established safety passages do not meet required standards.
12. Monitoring of excavation site deformation has not been carried out as required.
13. Settlement observations of surrounding structures have not been conducted as required.
14. No isolation or protective measures are in place for vertical cross-operations