Requirements for identifying potential hazards during major maintenance at CNPC: Immersive reading in a novel reader. Enterprises should, based on the overall goal of conducting maintenance every four to five years, establish specific operational targets and maintenance schedules for each set of equipment and each individual device. They need to identify the bottlenecks associated with long-term operation, and in particular, they must conduct a thorough analysis of the risk factors related to those devices whose failure can lead to shutdowns. Effective preventive measures should be developed to address these bottlenecks within a specified time frame. Conduct hazard inspections in terms of process technology, production bottlenecks, equipment, safety, and environmental protection. Address any issues that can be resolved promptly, while for those that cannot be dealt with immediately, a remediation plan and control measures should be developed after risk assessment, to be included in the maintenance schedule 3 months before shutdown. 1. Process-related inspections: (1) Identification of bottlenecks in production operations (calibration of the equipment is carried out before maintenance); (2) Assessment of the impact of catalyst lifespan on long-term operation.
2. Safety and environmental protection inspections: (1) Special inspection for damaged or improperly used personal protective equipment; (2) Special inspection of escape routes; (3) Special inspection of the compliance of structural platforms; (4) Special inspection for uncontrolled leaks; (5) Special inspection for leaks at static sealing points (in conjunction with VOC control).
3. Equipment-related inspections: (1) Special inspection for the proper management of pressure vessels and pipelines; (2) Special inspection for the proper functioning of safety valves; (3) Special inspection of rupture disks; (4) Special inspection related to salt deposition and corrosion in hydrogenation systems; (5) Special inspection of air coolers regarding their operation and corrosion; (6) Special inspection of the flow rate in water coolers; (7) Special inspection of thickness data related to corrosion risks; (8) Special inspection for external corrosion of equipment and pipelines; (9) Special inspection of small connections; (10) Special inspection for seal leaks in storage tanks; (11) Special inspection of flanges that frequently leak; (12) Special inspection for plugging leaks under pressure; (13) Special inspection of potential hazards related to underground pipelines; (14) Special inspection of spring supports and hangers; (15) Special inspection of improperly installed pipelines; (16) Special inspection of expansion joints; (17) Special inspection of dead corners; (18) Special inspection of thermal pipelines and insulation; (19) Special inspection of boiler water supply systems; (20) Special inspection of obsolete equipment and pipelines; (21) Special inspection for missing data and documentation related to equipment (including instrumentation and electrical systems).
4. Instrumentation-related inspections: (1) Inspection of the utilization rate of interlocks; (2) Inspection of instruments that cannot operate in automatic mode; (3) Inspection of safety instruments; (4) Inspection of online environmental monitoring instruments.
5. Electrical-related inspections: (1) Inspection of relay protection settings; (2) Inspection of the completion rate of electrical tests; (3) Inspection of cable temperature monitoring; (4) Inspection of the operation and maintenance of UPS (EPS) systems.
6. Other inspections: (1) Inspection of data and documentation, as well as equipment required for measurement; (2) Inspection of issues remaining from previous maintenance tasks and items that have not been resolved during previous system audits; (3) Inspection based on lessons learned from maintenance accidents in other companies over the past few years; (4) Special inspection of equipment (including materials) that has exceeded its designed lifespan
Reply #22025-12-28
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32025-12-28
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42025-12-28
【Ten Years of Rapid Development in Chemical Equipment】First of its kind in China from 2928 to 2025! Pilot production of Ordos’ “sand thermal battery” a success! https://bbs.hcbbs.com/thread-5709536-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-29
【Ten Years of Rapid Development in Chemical Engineering Equipment】Domestically developed unmanned emergency rescue equipment set released for the period 2023–2025: https://bbs.hcbbs.com/thread-5709649-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new breakthroughs in direct seawater electrolysis for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-30
【Ten Years of Rapid Development in Chemical Equipment】Many breakthroughs achieved from 2025 to 2035! The first phase of pipeline laying for China’s largest offshore pipeline project has been successfully completed. https://bbs.hcbbs.com/thread-5709667-1-1.html (Source: HCBBS Chemical Forum)
Reply #102025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first large-scale floating platform made of basalt steel for deep-sea aquaculture was launched in 2025: 2937-2025 https://bbs.hcbbs.com/thread-5709754-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.