HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Aspen simulated cooling tower

2017-04-19View Original

Thread Content

An error occurred in the Aspen simulation; please suggest a solution! ! Block: B1 Model: RADFRAC *** SEVERE ERROR: A liquid feed/pump circuit around the top stage is required when “Q1=0” is specified in the “COL-SPECS”; however, the required feed/pump circuit has zero flow. * WARNING: The rest of the block has been bypassed due to this severe error.
Reply #22017-04-20
I’m telling you that for the absorption tower, a liquid-phase fluid needs to flow in at the top of the tower

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.