HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The first high tower of Sinochem Refining’s coal-to-hydrogen plant has been installed

2019-06-30View Original

Thread Content

The first high tower of Sinochem Refining’s coal-to-hydrogen plant was installed. Author/Source: Zhanjiang Daily. Date: June 24, 2019. Clicks: 244. On the afternoon of June 20, with the help of a 4,000-ton giant crawler crane and a 500-ton crawler crane, the absorption tower for Sinochem Refining’s coal-to-hydrogen plant was successfully lifted into place. It is understood that this absorption tower has a diameter of 4.8 meters and a height of around 90 meters; its total lifting weight is over 800 tons, making it the tallest tower in the coal-to-hydrogen facility. The operating temperature of this tower ranges from minus 20 degrees Celsius to minus 55 degrees Celsius, and it plays an important role in product quality, thermodynamic balance, and the long-term operation of the facility. To date, Sinochem Refining and Chemicals has completed the lifting of 166 large-scale equipment units, with a total weight of 41,000 tons.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.