1. During the commissioning of the unit, it is necessary to switch each bottom pump once when the temperature at the furnace outlet reaches 90°.

2020-06-24View Original

Thread Content

1. During the startup process of the unit, it is necessary to ensure that each bottom pump switches once when the temperature at the furnace outlet reaches 90°. Why?
Reply #22020-06-24
Ensure the equipment is in good working condition, with spare equipment available to maintain normal production
Reply #32020-06-24
1. Preheat the standby pump to prevent damage to the pump body or leakage at some sealing points when switching pumps due to high temperatures; 2. The pump body is usually located at a lower position; is it also intended to remove the moisture inside the pump when the temperature rises, thereby preventing severe vaporization at high temperatures?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.