On-site construction of a heat exchange tower with a diameter of 10m

2020-07-13View Original

Thread Content

Recently, the company was tasked with manufacturing a tower with a diameter of 10 meters, a height of 27 meters, and a plate thickness of 22 mm. The company has never built a tower of this size before; the plan is to construct it on-site using the inverted construction method, with electric cranes being used to build each layer, in a manner similar to how large oil tanks are constructed on-site. I wonder if any of you experienced engineers have worked on towers of this scale; I would appreciate any advice you can offer, especially regarding safety measures during construction. Thank you
Reply #22020-07-13
Refer to the standard GB_50128-2014 _ Code for Construction of Vertical Cylindrical Welded Steel Storage Tanks
Reply #32020-08-01
Give it to me, I’ve done it before, 18877229966
Reply #42020-08-01
Next to the foundation, prepare a plan, divide it into sections, and build the enclosure layer by layer, using vertical assembly. Finally, lift and align the waist seam.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.