HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What should be reviewed after receiving the tower internals plan?

2022-11-16View Original

Thread Content

Hello, everyone who is into the sea! The company I work for wants to install a set of equipment with different production capacities. The existing distillation column comes with data sheets, and now the requirements for separation at the new capacity level, as well as the feed conditions and operating parameters, have been provided to the manufacturer of the column internals. What should I pay close attention to after the other party provides the results of their calculations along with the hydraulic data? Or how to verify/check whether the other party’s data is reliable enough to ensure actual production? Check with Aspen? Check with sulcol? I hope the experts here can give me some advice; thank you!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.