Thread Content
The last edit of this post was made by Desert Fish on 2022-11-10 at 08:23. Watch the decade-long development of chemical processing equipment; praise the prosperity and strength of modern China. Replies are encouraged – feel free to discuss! ------------------------------------------- On October 31, 2022, the ethylene distillation tower and pre-demethanization tower for ExxonMobil’s Huizhou Ethylene Project Phase I, manufactured by Hanyang Heavy Industry Equipment Manufacturing (Tianjin) Co., Ltd. (hereinafter referred to as Hanyang Heavy Industry), were successfully shipped from the port in the Lingang Industrial Zone of Binhai New Area, Tianjin. Among them, the ethylene distillation tower has a diameter of 6 m and a total length of 90 m; its main material is S30408 ; The maximum wall thickness of the pre-methane removal tower is 96 mm, with a total length of 72 m; its main material is S30408. The two stainless steel towers utilized over 1,500 tons of stainless steel material, setting new records in China for the largest single stainless steel tower in terms of manufacturing complexity, testing requirements, and overall weight.
Like —— 【Ten Years of Great Development in Chemical Equipment】605-2022: The Largest Single Stainless Steel Column Built in Tianjin in 2022 – The Pre-methanation Column: victory:
Thank you for sharing! These pre-demethanization towers are big!