HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Shuangxin Materials has invested 996 million yuan to build a project in Ordos, Inner Mongolia, for the production of 16,000 tons per year of high-barrier resins

2026-04-07View Original

Thread Content

On the evening of April 2, Shuangxin Materials issued a announcement stating that the 19th meeting of the company’s sixth board of directors approved a resolution to invest 996 million yuan in building a project in Ordos, Inner Mongolia, aimed at producing 16,000 tons per year of high-barrier resin. It is revealed that of the total investment for this project, 970 million yuan is allocated to construction costs, 18 million yuan to funds required for financing, and 8 million yuan to working capital ; The funding comes from 498 million yuan raised by the enterprise itself and 498 million yuan in bank loans. The project construction period is expected to be 3 years. Shuangxin Materials states that the sources of funding for this project include, but are not limited to, own funds and bank loans; the company will make reasonable plans and adjustments based on the actual funding situation and the progress of project implementation. Shuangxin Materials stated that high-barrier resins represent an extension of the company’s vinyl acetate production into downstream industries, and the implementation of a project to produce 16,000 tons of high-barrier resins per year is in line with the company’s strategy to extend, supplement, and strengthen its industrial chain. With the rapid development of the domestic economy, industries such as food, pharmaceuticals, cosmetics, and electronics have an increasing demand for high-performance packaging materials, which has driven rapid growth in the market demand for high-barrier resins. If the company succeeds in commercializing high-barrier resins, it will create new sources of profit growth, effectively enhancing the company’s profitability. This holds significant strategic importance for the company’s sustainable development and for maintaining a competitive advantage in the industry.
Reply #22026-04-07
【History of Haichuan Chemical】30 years ago, people carried materials by hand to build the Shaanxi-Beijing natural gas pipeline; today, such methods would be considered illegal! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717273 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-04-07
【Ten Years of Rapid Development in Chemical Equipment】China’s first and largest production line capable of producing 10,000 tons of polyhydroxyalkanoates (PHA) was built between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717057 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-04-08
【Ten Years of Rapid Development in Chemical Equipment】China’s first and largest production line capable of producing 10,000 tons of polyhydroxyalkanoates (PHA) was built between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717057 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52026-04-08
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711616 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #62026-04-09
【Ten Years of Rapid Development in Chemical Engineering Equipment】3069–2026: The Space Exploration Initiative and Inner Mongolia Baofeng’s construction of China’s first cluster of electrolytic hydrogen production facilities installed outdoors https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717373 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-04-10
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, SHENGU Group successfully developed the world’s first reciprocating compressor with an ultra-high thrust of 2000 kN! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717432 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #82026-04-11
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China’s first pilot project for hydrogen combustion in 660-megawatt coal-fired boilers achieved breakthroughs in both coal-hydrogen mixed combustion and pure hydrogen combustion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717514 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-04-11
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Incorrect Installation Direction of the Flange Cover on the Drain Valve of Storage Tanks https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717574 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.