HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Ten Years of Rapid Development in Chemical Processing Equipment】The 730-2019 Zhanjiang offshore refined oil pipeline on the Chinese mainland, with a length of up to 4,071 meters

2022-12-23View Original

Thread Content

This post was last edited by Desert Fish on 2022-12-24 at 14:56. Witnessing the ten-year rapid development of chemical processing equipment; praising the prosperity and strength of modern China. This is just a preliminary contribution – we welcome everyone to participate more actively in discussions on this forum. The more people involved, the more lively it becomes. Haichuan becomes even better with you here. Replies will be rewarded; feel free to discuss! ------------------------------------------------- On May 27, 2019, the longest undersea crude oil pipeline in the Chinese mainland was successfully laid across the Tongming Strait. The directional drilling across the Tongming Strait is the core project of the Sinopec integrated refined oil pipeline project (Zhanjiang to Beihai). It starts from Donghai Island in Zhanjiang City and ends in Huguang Town on the opposite shore. The project presents technical challenges such as complex engineering geology, high environmental protection requirements, and limited space for prefabrication. With a total drilling length of 4,071 meters, it sets a record for the longest directional drilling distance for an undersea refined oil pipeline in mainland China. The refined oil pipeline connected to Sinochem Refining and Chemicals has a total length of 248 kilometers. Once completed, it will facilitate the efficient operation of refined oil pipelines in China’s southwestern provinces, overcome the challenges posed by insufficient resources for pipeline transportation as well as the difficulty in transporting resources from coastal areas, and ensure a stable supply of refined oil to Guangdong and the southwestern regions. The successful directional drilling passage not only laid the foundation for the pipeline to be completed on schedule and put into operation, but also provided valuable experience for the construction of long-distance undersea crossings for oil product pipelines.
Reply #22022-12-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The longest domestic petroleum product pipeline, with a length of 2,080 kilometers, the Lan-Zheng-Chang petroleum product pipeline, came online between 1973 and 2013. https://bbs.hcbbs.com/thread-3587649-1-1.html (Source: Haichuan Network – Chemical Industry News)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.