Looking at the great development of chemical equipment in the past ten years, I praise the prosperity of China and wish everyone a happy new year. May the whole family be safe and healthy. It will be more lively and exciting with everyone's participation. Welcome everyone to participate in more forum exchanges and discussions------------------------------------------------ ------------------On December 7, 2003, the 33,000-kilowatt large flue gas turbine jointly developed by Sinopec Group Engineering Construction Company and CNPC Lanzhou Refining and Chemical Machinery Plant was successfully put into operation in the 3 million tons/year heavy oil catalytic cracking unit of Lanzhou Petrochemical Company and passed the appraisal and acceptance by the expert group. This marks the official birth of my country’s first 33,000-kilowatt large flue gas turbine. According to reports, flue gas turbines are key energy-saving equipment in petrochemical catalytic cracking units. The development and production of extra-large flue gas turbines with a power of more than 20,000 kilowatts has been a blank in China. There are only three 33,000-kilowatt flue gas turbines in the world, all of which are made in the United States. The commissioning of the 33,000-kilowatt large-scale flue gas turbine jointly developed by Sinopec Group Engineering Construction Company and CNPC Lanzhou Refining and Chemical Machinery Plant shows that my country's technology, process design and materials in the field of flue gas turbines have reached the world's leading level. The expert group determined that this cigarette machine has made major breakthroughs in technology, process design and material application. All technical indicators have met the design requirements and can replace imported products. Based on the usual calculation of 8,000 hours of operation per year, it can save 264 million kilowatt hours of electricity annually and create direct energy saving benefits of more than 80 million yuan.
The last hurdle for domestically produced flue gas turbines to leave the factory https://bbs.hcbbs.com/thread-398512-1-1.html (Source: Haichuan.com-Huahaichuanliu)
On May 21, 2009, the YL19000A flue gas turbine, which represents the highest level of flue gas turbine design and manufacturing in my country, completed the thermal test at the Lanzhou Petrochemical Company Machinery Factory. All indicators met the design requirements and will be delivered to Guangxi Petrochemical Company for use in the near future. The flue gas turbine is the key equipment for energy recovery in the catalytic cracking unit of the refinery. It uses the high-temperature flue gas generated when the regenerator of the catalytic cracking unit is charred to expand the medium to do work, or drive the main fan or drive the generator to generate electricity. This flue gas turbine designed and manufactured by the Machinery Factory of Lanzhou Petrochemical Company. Its technical indicators represent the highest level of flue gas turbine design and manufacturing in my country. It is currently the most powerful flue gas turbine for use in low-altitude areas in China, and it is also the flue gas turbine with the largest flue gas flow rate in my country.
[Ten years of development of chemical equipment] Continue to update summary posts, welcome to participate in the discussion https://bbs.hcbbs.com/thread-3576046-1-1.html (Source: Haichuan.com-Huahaichuanliu)