Thread Content
Ningxia Coal Industry Company’s 100,000 tons/year EVA project: On November 15, the construction of the underground main pipeline network for **Energy Group Ningxia Coal Industry Company’s 100,000 tons/year ethylene-vinyl acetate copolymer project (hereinafter referred to as the “EVA project”) began, marking the official start of construction for this project. The 100,000 tons per year EVA project is a key construction project under the **Energy Group’s 14th Five-Year Plan**, and it is also a major initiative aimed at extending, strengthening, and optimizing the coal chemical industry chain as part of Ningxia Coal Industry Company’s 14th Five-Year Plan. The project is located in the coal chemical industry park of the Ningdong Energy and Chemical Industry Base, covering an area of about 11 hectares. The project makes use of the excess ethylene as well as utilities such as water, electricity, steam, and air available at Olefin Two Company to produce EVA products for various applications, including photovoltaic film, cable materials, foam footwear materials, hot melt adhesives, and agricultural films. The project is managed by the Coal-to-Oil Chemicals Command, which works closely with entities such as infrastructure construction companies, energy engineering companies, and supervision firms to jointly carry out the project construction. This underground main pipeline project involves the construction of multiple systems, including fire water systems, circulating water systems, rainwater systems, etc. The project is scheduled to be completed by the end of May 2025.