Thread Content
Safety first. Prevention first: Let’s praise and encourage the achievements made in China’s chemical engineering technology and equipment. **********************【Ten Years of Great Development in Chemical Engineering Equipment】Regular updates and summaries are available; feel free to join the discussions at https://bbs.hcbbs.com/thread-3576046-1-1.html (Source: Haichuan Chemical Engineering Forum) ***************** On November 25, 2024, the radiation sections of the two cracking furnaces in the Huajin project were slowly brought to the Huajin dock. The project team from the shipping company organized the loading and unloading process, ensuring that the radiation sections were installed safely, stably, and accurately. Subsequently, the lifting and positioning work for the radiation section of the cracking furnace was carried out. After the radiation section of the first pyrolyzer was installed, the project team quickly adjusted its strategies and optimized work processes, completing the installation of the radiation section of the second pyrolyzer on November 29. It is reported that this is the largest-scale shipment to date of the radiation section of an ethylene plant’s cracker, transported by sea to the project site as a single unit, which signals an acceleration in the construction of the project.
Multiple images! ! Super-large equipment for the Huajin Amei Fine Chemicals and Raw Materials Project has been arriving at the site one after another. https://bbs.hcbbs.com/thread-5674701-1-1.html (Source: Haichuan Chemicals Forum [Haichuan Network])
Modularity of large-scale installations is a trend
【Ten Years of Rapid Development in Chemical Equipment】From 2042 to 2024: China National Petroleum’s first complete ethylene cracking furnace module weighing 3,200 tons was successfully installed. https://bbs.hcbbs.com/thread-5674660-1-1.html (Source: Haichuan Chemical Industry Forum [Haichuan Network])
【Ten Years of Rapid Development in Chemical Equipment】2044–2024 Guangxi Petrochemical Integration Project – Ethylene Facility’s Gasoline Hydrogenation Module https://bbs.hcbbs.com/thread-5674757-1-1.html (Source: Haichuan Chemical Forum [Haichuan Network])
【Ten Years of Rapid Development in Chemical Equipment】2045–2024 Guangxi Petrochemical Integration Project – Ethylene Facility’s Gasoline Hydrogenation Module https://bbs.hcbbs.com/thread-5674757-1-1.html (Source: Haichuan Chemical Forum [Haichuan Network])