Thread Content
Hongyang Hydrogen-Rich Energy Technology (Fuhai) Co., Ltd.’s Integrated Photovoltaic, Energy Storage, Hydrogen, Ammonia and Alcohol Project in Fuhai County: This project is located in Fuhai County, Altay Region, Xinjiang; the site for the hydrogen production via water electrolysis is situated within the Altay Fuhai Industrial Park; The location of the photovoltaic power generation system is about 42 km south of Fuhai County, and it was invested in and constructed by Hongyang Huyun Energy Technology (Fuhai) Co., Ltd. The project is constructed in two phases; the first phase involves the construction of a green hydrogen production system with an annual capacity of 36,000 tons ; The second-phase project will build a 100,000-ton/year green synthetic ammonia production line and a 150,000-ton/year synthetic methanol system. Supporting photovoltaic systems: A new 1780MW photovoltaic power generation system will be established, which includes 4 220kV step-up substations, a 360MW/360MWh electrochemical energy storage system, 220kV transmission lines, and other associated facilities and equipment. The construction scope of Phase 1 mainly includes the installation of a new electrolytic water hydrogen production system with a capacity of 72,000 Nm3/h along with related auxiliary systems, 2 electrolyzers with a capacity of 2,000 Nm3/h each, 21 electrolyzers with a capacity of 3,000 Nm3/h each, and 1 electrolyzer with a capacity of 5,000 Nm3/h; in addition, 30 spherical storage tanks with a capacity of 2,000 m3 at 1.5 MPa will be installed. A new photovoltaic power generation system with a capacity of 1,780 MW will also be built, which includes 4 220 kV step-up stations and an electrochemical energy storage system with a capacity of 360 MW/360 MWh. The project investment amount is 745.4 million yuan.
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt-cave compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Unsecured and Not Properly Sealed Aluminum Insulation Layers for Pipes https://bbs.hcbbs.com/thread-5708978-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2907-2025: China’s First Civilian Liquid Hydrogen Plant Obtains Safety Production Permit https://bbs.hcbbs.com/thread-5708618-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest 9600 Nm³/h multi-functional hydrogen production BOP system was successfully delivered https://bbs.hcbbs.com/thread-5708761-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2009 to 2025, Ningmei Group made significant progress in the key technologies related to the extraction of rare gases such as krypton and xenon from ultra-large air separation units. https://bbs.hcbbs.com/thread-5708777-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】The first domestic emergency drill on land for 1,500-meter-class ultra-deep-water submarine pipelines was successfully carried out from 2010 to 2025. https://bbs.hcbbs.com/thread-5708788-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2891-2025: Filling Technical Gaps! ! ! Our country conducted the first full-scale test of leak-induced jet fire in high-pressure pure hydrogen pipelines. https://bbs.hcbbs.com/thread-5707712-1-1.html (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))