Thread Content
Announcement on the completion inspection of Fujian Hua Yi San Aifu Fluorine You project! On December 23, a public announcement was made regarding the completion of the environmental protection inspection for the first phase of the Sanai Fu (Shaowu) Fluorine Chemistry Industry Base project. The scope of this interim acceptance covers only the facilities that have been built and put into trial production, along with the associated auxiliary and supporting systems. The main facilities included in this acceptance are those for annual production of 3,000 tons of HFPO, 200 tons of PPVE and its derivative products (including 200 tons of PPVE per year, 80 tons of PMVE per year, 100 tons of PEVE per year, and 80 tons of HFPO trimer per year); 2,000 tons of hexafluorinated ** per year; 1,000 tons of bisphenol AF per year; 1,000 tons of hexafluoroisopropanol per year; 500 tons of perfluoropolyether per year; 250 tons of fluoronitrogen gas per year; and 356 tons of trifluoroacetic acid and its derivative products (including 356 tons of trifluoroacetic acid per year, 15 tons of ethyl trifluoroacetate per year, and 568 tons of potassium fluoride per year). The associated environmental protection and auxiliary systems also fall under this acceptance. The facilities for annual production of 50 tons of hexafluorobutadiene (under construction) and the hydrogen production plant with a capacity of 720,000 Nm3/year (not yet built) are not included in this acceptance. Through on-site inspections and monitoring by the acceptance team, it was confirmed that during the actual construction of the project, all construction activities were carried out in strict accordance with the requirements outlined in the environmental impact assessment and relevant approvals, and the environmental protection principle of \"simultaneous implementation of environmental protection measures along with construction\" was strictly observed throughout the construction process. Upon acceptance monitoring, the emissions of wastewater, exhaust gas, and noise all meet the relevant emission standards as well as the requirements specified in the project’s environmental impact assessment and the decisions issued by the approval authorities. Solid waste is stored and disposed of in strict accordance with relevant regulations. In summary, it is recommended to conduct environmental protection inspections upon phased completion.
【Ten Years of Rapid Development in Chemical Equipment】2119–2024: TianDa’s Technological Advancements! World’s largest single-unit calcium formate production facility https://bbs.hcbbs.com/thread-5676602-1-1.html (Source: Haichuan Chemical Industry Forum [Haichuan Network])