The annual production capacity of 0.5 tons of PVDF and 0.3 tons of HFPO at the Shaowu Yonghe plant has been completed and put into operation!

2025-01-16View Original

Thread Content

On January 13, a public announcement was made regarding the completion of the environmental protection inspection for the phased expansion project of Shaowu Yonghe Jintang New Materials Co., Ltd., which aims to increase annual production capacity by 10kt of polyvinylidene fluoride and 3kt of hexafluoroepoxypropane. The scope of this expansion project, namely the \"Shaowu Yonghe Annual Production Capacity Expansion Project for 10kt of PVDF and 3kt of HFPO\", involves an annual production capacity of 10,000 tons of PVDF and 0.3 million tons of HFPO. Due to market conditions, the current maximum production volume of PVDF is only 0.5 million tons; therefore, the acceptance of this project will be carried out in phases. The design capacity for this phase of acceptance is 0.5 million tons of PVDF and 0.3 million tons of HFPO per year. The inspection will cover the production processes involved in this expansion project, as well as the equipment and facilities used, as well as the handling of wastewater, exhaust gases, and noise, along with other aspects related to raw materials and inputs. As confirmed by the acceptance team, the project has essentially implemented the pollution prevention measures outlined in the environmental impact report and the corresponding approval decisions; wastewater, exhaust gas, and noise levels at the plant boundaries are within acceptable limits, and solid waste is disposed of properly. The project has little impact on the environmental quality of the surrounding air, soil, and groundwater. In accordance with the circumstances of unqualified acceptance specified in the Interim Measures for Environmental Protection Acceptance upon Completion of Construction Projects, a thorough check was carried out on this project item by item; no unqualified items were found, and it basically meets the conditions for environmental protection acceptance upon completion. Therefore, approval for acceptance is granted.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.