Thread Content
The Xiongan natural gas project for the Shaanxi-Beijing pipeline has been approved. Recently, the Hebei Provincial Development and Reform Commission granted approval for the project aimed at providing natural gas to the Xiongan New Area via this pipeline, marking the entry of this important energy infrastructure project into the preparation phase for implementation; construction is expected to begin in early October. The project is located in Renqiu City and the Xiongan New Area of Hebei Province. The pipeline starts at Valve Room 35# of the Shaanxi-Beijing Line 2 and ends at the Xiongan terminal station. Backed by the Shanjing pipeline system, this project brings together high-quality gas supplies from Central Asia, Russia, the Tarim region, Changqing, and other areas, and delivers gas to Xiongan Smart Energy and Kunlun Gas through the newly built Xiongan terminal station. The total length of the newly built pipeline is 5.8 kilometers, of which 4.97 kilometers are located within Renqiu City and 0.83 kilometers are within Xiongan New Area. The pipeline is designed for a pressure of 10 MPa, with a diameter of 610 millimeters. Its annual gas delivery capacity is 3.16 billion cubic meters, sufficient to supply gas to 5.3 million residents. As the third gas supply source for Xiongan New Area provided by the Pipeline Network Group, this project is the first natural gas supply pipeline built specifically for Xiongan New Area. Once completed, it will supply clean energy to the residents of Xiongan New Area, as well as to public services and centralized heating systems. This dedicated line can replace 3 million tons of coal combustion each year, reducing carbon emissions by 7 million tons and helping to further optimize the regional energy structure.
【Ten Years of Rapid Development in Chemical Equipment】The first domestic project for producing hydrogen from coke oven gas using pressure swing adsorption (PSA) technology was successfully put into operation between 2023 and 2025. https://bbs.hcbbs.com/thread-5698597-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2606-2025: A first in China! Completion of the system integration for the first batch of intelligent welding robots for flexible manufacturing in offshore engineering projects https://bbs.hcbbs.com/thread-5698619-1-1.html (Source: Haichuan Chemical Industry Forum)
【History of Haichuan Chemical】The Birth of China’s First Large-Scale Modern Alcohol Plant https://bbs.hcbbs.com/thread-5697868-1-1.html (Source: Haichuan Chemical Forum)
【History of Haichuan Chemical】The Birth of China’s First Large-Scale Modern Alcohol Plant https://bbs.hcbbs.com/thread-5697868-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Equipment】China Petrochemical’s first integrated process simulation software was successfully tested on Unit 3 of the Zhenhai Refining & Chemical Complex from 2009 to 2025. https://bbs.hcbbs.com/thread-5698666-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2607-2025: Independently developed radar for monitoring fire-induced deformation in storage tanks to assist in assessing their condition https://bbs.hcbbs.com/thread-5698662-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】High-quality completion of China National Petroleum’s first independently designed PO/SM unit as part of the Guangxi Petrochemical integration and transformation project, 2611–2025 https://bbs.hcbbs.com/thread-5698681-1-1.html (Source: Haichuan Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2013 to 2025: China’s independently developed CMT fully automatic welding equipment for offshore engineering was used for the first time. https://bbs.hcbbs.com/thread-5698711-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2614 to 2025: ANGANG Group’s AG785 spherical tank steel, with a strength of 785 MPa and high toughness and pressure resistance, was used for deep-sea containers for the first time in the world. https://bbs.hcbbs.com/thread-5698753-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2016 to 2025, Tianhua Institute independently developed 8 heat box systems, which were successfully deployed in ExxonMobil’s 500,000 tons per year low-density polyethylene (LDPE) production facility. https://bbs.hcbbs.com/thread-5698775-1-1.html (Source: Haichuan Chemical Industry Forum)