Ningxia Wanhe Energy Technology Co., Ltd.’s coal-based high-end chemicals industry chain project with a total investment of 11.3 billion yuan

2025-12-11View Original

Thread Content

Project Name: Ningxia Wanhe Energy Technology Co., Ltd. Coal-based High-End Chemicals Industry Chain Project; Construction nature: New construction ; Construction unit: Ningxia Wanhe Energy Technology Co., Ltd ; Construction location: Located in the Modern Coal Chemical Industry Zone of the Ningdong Energy and Chemical Industry Base in Ningxia ; Project investment: 1,130,000 million yuan; environmental protection investment: 1,126 million yuan, accounting for 4.17% of the total investment. Construction scale: This project mainly involves the construction of main process units such as air separation units, gasification units, shift/purification units, and synthesis units, along with the supporting auxiliary and utility systems. Upon completion of the project, the total production capacity will be 1.0262 million tons per year. The main products will include 34,900 tons per year of α-olefins, 69,400 tons per year of alkylbenzenes, 38,600 tons per year of PAO, 108,900 tons per year of n-alkanes, 58.24 million tons per year of liquid paraffins, 92,100 tons per year of higher carbon alcohols, and 100,000 tons per year of concentrated sulfuric acid.
Reply #22025-12-11
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-12-11
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first 50,000 tons per year facility for producing anhydrous ethanol through synthetic gas biofermentation successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #42025-12-11
【Ten Years of Rapid Development in Chemical Processing Equipment】The first national \"5G + Industrial Internet\" smart coking system was put into operation in 2025 – a project with an annual production capacity of 3.6 million tons of compacted coke. https://bbs.hcbbs.com/thread-5706895-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-12
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with completely independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #62025-12-12
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and text; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #72025-12-13
【Ten Years of Rapid Development in Chemical Equipment】2894-2025: SINOPEC CRIC Builds the World’s Largest and Heaviest EO Reactor https://bbs.hcbbs.com/thread-5708001-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #82025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2895-2025: The Sixth Academy of Aerospace Engineering built China’s first commercial liquid hydrogen refueling station, which was officially put into operation in Panzhihua. https://bbs.hcbbs.com/thread-5708004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】2896-2025: China’s first AI-based intelligent inspection model for steel pipes has been put into industrial use at Bao Shi Pipe Industry https://bbs.hcbbs.com/thread-5708019-1-1.html (Source: HaiChuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #102025-12-14
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2870 to 2025! China’s first pilot production line for ceramsite using coal gangue on a scale of tens of millions of tons has been put into operation. https://bbs.hcbbs.com/thread-5707225-1-1.html (Source: HCBBS Chemical Forum)
Reply #112025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first zero-carbon data center that utilizes pressure energy was officially put into use in Shaoxing, Zhejiang, from 2874 to 2025. https://bbs.hcbbs.com/thread-5707292-1-1.html (Source: HCHBBS Chemical Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.