HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The main structure of the Tongling Molifu environmental protection project has been completed

2025-12-24View Original

Thread Content

Recently, the main structures of Workshop 1 and Warehouse 1 for the Molifu Environmental Protection project in Tongling were successfully completed under the supervision of Sinochem Sanhua Construction (Lüfa) Anhui Construction Co., Ltd. The project owner, Tongling Molifu Environmental Protection Technology Co., Ltd., sent a letter of thanks, expressing full recognition of the project team’s ability to meet the set deadlines while maintaining quality, and praising their professional skills and commitment to cooperation throughout the construction process. The project is located in the Xinlou Industrial Park of Congyang County, Tongling City, covering an area of 72 mu; it is a key municipal environmental protection project. Since its inception, the project has taken \"green construction and efficient building\" as its core objectives. Faced with challenges such as tight schedules, technical difficulties, and the need to carry out multiple high-risk construction tasks, the project team adhered to the principles of \"strict supervision, excellent service, and improved efficiency\" in organizing the construction work. They strengthened safety briefings and cost control, while also implementing environmental protection measures such as dust control and noise reduction to minimize the impact on the surrounding environment. As a result, the goal of completing the main structure was successfully achieved, laying a solid foundation for the subsequent installation of equipment.
Reply #22025-12-24
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32025-12-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first commercial supercritical carbon dioxide power generation unit was successfully put into operation in Liupanshui, Guizhou, from 2911 to 2025. https://bbs.hcbbs.com/thread-5708920-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】The first domestically produced high-sulfur content compression unit at the Puguang Gas Field has operated for over 20,000 hours (2914–2025) https://bbs.hcbbs.com/thread-5709131-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-25
【Ten Years of Rapid Development in Chemical Equipment】2915-2025: Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #62025-12-25
【Ten Years of Rapid Development in Chemical Equipment】2915-2025: Amazing! China achieves for the first time the high-temperature cooling and transportation of oil, gas, and water mixtures using offshore unmanned platforms https://bbs.hcbbs.com/thread-5709132-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72025-12-25
【Ten Years of Rapid Development in Chemical Equipment】Breakthroughs from 2905 to 2025! SHanghai Electric’s 300MW-class large-scale air turbines ensure the operation of China’s salt cavern compressed air energy storage demonstration project https://bbs.hcbbs.com/thread-5708518-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-26
【Ten Years of Rapid Development in Chemical Equipment】The first electrocracking furnace in China was successfully put into operation at Dushanzi Petrochemical Company between 2016 and 2025. https://bbs.hcbbs.com/thread-5709248-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #92025-12-26
【Ten Years of Rapid Development in Chemical Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #102025-12-26
【Ten Years of Rapid Development in Chemical Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #112025-12-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2921 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.