HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Environmental impact assessment for the 70,000-ton-per-year technical upgrade project of etherification-based isobutylene production at Zibo Qixiang Tengda Chemical Co., Ltd. has been accepted

2025-12-29View Original

Thread Content

Recently, the Zibo Ecology and Environment Bureau issued a public notice announcing that the environmental impact assessment report for Zibo Qixiang Tengda Chemical Co., Ltd.’s 70,000-ton-per-year technical upgrade project for the production of isobutylene through etherification has been accepted for review. It is reported that the total investment in this project amounts to 20.73 million yuan. The existing 70,000 tons per year etherification plant for producing isobutylene will be partially upgraded; the main production equipment (the MTBE etherification plant for isobutylene production) will be modified. The reactors and towers will make use of the existing equipment, while four new units will be added, including a tert-butanol feed evaporation tank and evaporators. Other utilities, storage and transportation systems, as well as environmental protection facilities will also make use of the existing infrastructure. After the technical upgrade, both butanol and MTBE can be used to produce isobutylene, and the production capacity of isobutylene remains unchanged following the upgrade.
Reply #22025-12-29
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling Te Tu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: HCBBS Chemical Forum)
Reply #32025-12-30
【Ten Years of Rapid Development in Chemical Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #42025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】2931-2025: Dongfang Electric makes new progress in the direct electrolysis of seawater for hydrogen production, achieving 1000 hours of continuous operation https://bbs.hcbbs.com/thread-5709640-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #52025-12-30
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2934 to 2025! Jinling Te Tu’s new high-temperature resistant anti-corrosion coating has been granted a **patent license https://bbs.hcbbs.com/thread-5709650-1-1.html (Source: HCBBS Chemical Forum)
Reply #62025-12-30
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first large-scale basalt steel material deep-sea aquaculture floating platform was successfully launched between 2025 and 2937. https://bbs.hcbbs.com/thread-5709754-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #72025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #82025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #92025-12-31
【Ten Years of Rapid Development in Chemical Equipment】The pilot production base of the Hami High-Oil Coal Research Institute, covering the period 2020–2025, was officially put into use in Yiwu County. https://bbs.hcbbs.com/thread-5709304-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #102025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2025: Domestic production of key equipment for Puguang Gas Field, China’s first high-sulfur natural gas processing facility with a capacity of 10 billion cubic meters https://bbs.hcbbs.com/thread-5709886-1-1.html (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #112025-12-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s first 30-megawatt-class pure hydrogen gas turbine came online between 2040 and 2025. https://bbs.hcbbs.com/thread-5709894-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.