【Haichuan Project Updates】Feasibility study meeting for the Yuyang-Yuheng coal-based aromatics project held

2020-05-26View Original

Thread Content

With a total investment of around 42.645 billion yuan, an expert review meeting was held for the feasibility study report of the Yuheng coal-based aromatics project carried out by Yan’an Petroleum in Yulin City. On May 22nd, Yan’an Petroleum Group invited 9 well-known experts from the domestic chemical industry to hold a review meeting in Xi’an regarding the feasibility study report for this project. Relevant departments of the group company, expert groups, the engineering cost center and mining companies, as well as professional technicians from Yulin Coal Chemical and Yuheng Coal Chemical Companies and Beijing Engineering Company attended the meeting. The Yuheng coal-based aromatics project builds upon the HuanDian million-ton aromatics project, dividing the original project into the Yuheng coal-based aromatics industrial demonstration project and the Yuheng coal-based aromatics project implementation phase. The total planned investment is 49.788 billion yuan, covering an area of 386 hectares, with an annual coal processing capacity of 8 million tons. Preparatory work for commencement is currently in progress
Reply #22020-05-26
Beijing Engineering Company has another big project ahead @WisdomBright
Reply #32020-05-26
It’s just a feasibility study; it’s still uncertain who will be assigned the design task. Aromatics are a strength of Xi’an Hualu Institute.
Reply #42020-05-27
Beijing Engineering Company is a subsidiary of the owner. Looking at the previous project, Beijing Institute served as the leading company for the owner; it is likely that detailed process design will still be entrusted to various specialized companies. Is this also an opportunity for Yanchang to train its team?
Reply #52020-05-27
Design coordination meeting for Shaanxi Yanchang Petroleum Yushen Energy Chemical’s 500,000 tons/year coal-based ethanol project held https://bbs.hcbbs.com/thread-3013465-1-1.html (Source: Huahai Chuanliu – Haichuan Chemical Forum Website) ============================= On May 25th, the kick-off meeting for the circulating fluidized bed boilers and steam turbine generators of Shaanxi Yanchang Petroleum Yushen Energy Chemical Co., Ltd.’s 500,000 tons/year coal-based ethanol project, as well as the first design coordination meeting, were held in Chengdu. Liao Xin, assistant to the general manager of Dongfang Boiler Co., Ltd. under Dongfang Electric Group, Gao Yihan, project manager and design manager of the power station at Beijing Petrochemical Engineering Co., Ltd., Zhang Xiaodong, deputy general manager of the company, along with relevant technical staff, attended the meeting. ======================================== Beijing Engineering Company also carries out detailed design
Reply #62020-05-27
It is estimated to be a peripheral supporting design project. Don’t you see that for core designs of power plants such as \"circulating fluidized bed boilers and steam turbine generator sets,\" Dongfang Electric and Dongfang Boiler are the ones responsible for providing the complete systems?
Reply #72020-05-27
Dongfang Boiler’s fluidized bed technology is quite good
Reply #82020-05-27
The work to be carried out presumably includes: coal storage yard, coal transfer trestle, water treatment, general layout planning, vertical design...; it’s not clear whether the capability exists for sulfur and nitrogen removal It’s probably to hire a professional company. The 110KV connection system is also likely to require outsourcing to a specialized company.
Reply #92020-05-27
He is actually carrying out the functions of the Yanchang Petroleum Project Company
Reply #102020-05-27
Being able to integrate various resources is also a skill
Reply #112020-05-27
Yes, it essentially serves to assist the group’s development department in formulating long-term plans, conducting evaluations for technical upgrades, preparing project proposals and feasibility studies, as well as designing projects related to technical improvements – acting in the role of a small-scale design institute for the group. Just like the functions of the factories and facilities established by Sinopec and CNPC in various locations. Second, in coordination with the extended group engineering management department, carry out project organization and management for the group’s construction projects. Third, carry out EPC projects whenever possible.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.