HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Ten Years of Rapid Development in Chemical Equipment】581 – The two 67.1-meter extraction distillation towers for the Baling petrochemical project were transported successfully through streets and alleys to their intended location

2022-10-14View Original

Thread Content

This post was last edited by Desert Fish on 2022-10-15 at 11:25. The two extraction distillation towers for the Baling project have been successfully transported in place. The extraction distillation tower is currently the longest piece of equipment in the transportation facilities of the Baling project; it is 67.1 meters long, has a maximum diameter of 4.2 meters, and weighs 213 tons. It is transported using a Goerdelhauff configuration with 2 rows and 16 axes.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.