Thread Content
Projects in the downstream petrochemical industry and related value chains: Owner – Shandong Yulong Petrochemical Co., Ltd.; Location of construction – Yantai, Shandong; Investment amount – 117.857 billion yuan. Project progress: Engineering design phase. Project overview: Leveraging the raw material advantages provided by the Yulong Island integrated refining and chemical complex (Phase I), which has a capacity of 20 million tons per year for oil refining, 3 million tons per year for ethylene production, and 3 million tons per year for PX production, this project aims to develop more than 50 types of high-value-added new materials such as POE elastomers, nylon 66, and carbon fiber precursors. It seeks to create a closed-loop industrial chain that spans from crude oil to olefins, aromatics, and advanced new materials, thereby achieving a revolutionary leap from basic chemical raw materials to high-end end products. The project involves the construction of 56 sets of production units, along with complete utility systems, auxiliary facilities, and storage and transportation systems. This results in the formation of five major core industrial chain clusters, increasing the added value of chemical products by over 80%. Construction is scheduled to begin in June 2026, with the groundwork for the first batch of facilities (POE, nylon 66, acrylonitrile) getting underway. Expected commissioning date: August 2029, when the project will be fully completed and put into operation
【3D Process Flow】Summary Post – Useful for learning about the process flow: https://bbs.hcbbs.com/thread-5711616-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982-2026 https://bbs.hcbbs.com/thread-5711847-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2025 to 2036, the first industrial control system in the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2025 to 2036, the first industrial control system in the petrochemical industry, with 100% domestically produced software and hardware, was successfully put into use in complex petrochemical plants. https://bbs.hcbbs.com/thread-5711442-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2983 to 2026: Jiangsu Qidong built the world’s largest 30,000-cubic-meter land-based liquefied petroleum gas storage tank, which was shipped overseas https://bbs.hcbbs.com/thread-5712041-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】2984-2026: Domestic production and application of rotary valves, key components in aromatic hydrocarbon adsorption and separation units at Shanghai Petrochemical Company https://bbs.hcbbs.com/thread-5712074-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2987 to 2026, Weifang Gaomi Haomai delivered multi-axis centrifugal compressors capable of handling 180,000 standard cubic meters of air. https://bbs.hcbbs.com/thread-5712097-1-1.html (Source: HCHBBS Chemical Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2029 to 2026, CNOOC Engineering’s first intelligent acoustic imaging inspection system was put into use for high-pressure airtightness testing of the process pipelines at Shell’s project in Nigeria. https://bbs.hcbbs.com/thread-5711490-1-1.html (Source: Hachuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial production facility for the polyphase hydroformylation of ethylene using single-atom catalysts was put into operation between 2017 and 2020. https://bbs.hcbbs.com/thread-5711445-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】2988-2026: “Robots + AI”! Hangyang Group’s \"Intelligent On-site Inspection Management System for Air Separation Units\" has been put into full use: https://bbs.hcbbs.com/thread-5712099-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))