HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The total investment exceeds 13.3 billion! 5 hydrogen energy projects have been selected as key construction projects in Guangdong Province for 2026

2026-01-31View Original

Thread Content

Recently, the list of key construction projects in Guangdong Province for 2026 was released, featuring 1,850 key projects and 980 preliminary projects, with a total investment of around 8.6 trillion yuan, and an annual planned investment of 1.05 trillion yuan. Among them, 1,497 projects are continuing (including 316 projects aiming to start operations), and 353 new projects have begun. Among them, there are 5 projects related to hydrogen energy. Green Chemical Industry and Hydrogen Energy Industrial Park Infrastructure Construction Project. Location: Maoming City. Total investment: 640,400 million yuan. Annual planned investment: 40,000 million yuan. Scope of construction: site leveling, comprehensive water quality treatment, breakwaters, port and waterway projects, as well as other supporting facilities.

R&D Center for Core Components of Hydrogen Fuel Cell Systems and Technology Applications in Hydrogen Energy Infrastructure. Location: Guangzhou. Total investment: 148,900 million yuan. Annual planned investment: 25,000 million yuan. Scope of construction: establishment of an institute for innovation in hydrogen energy technology and industry, a headquarters complex, and intelligent production workshops.

Yuntao Hydrogen Energy Modified Vehicle Manufacturing Plant and Related Supporting Projects. Location: Guangzhou. Total investment: 200,000 million yuan. Scope of construction: manufacturing plants for modified vehicles and related supporting facilities.

Xingfeng Domestic Waste-to-Hydrogen Circular Economy Industrial Park in Baiyun District, Guangzhou. Location: Guangzhou. Total investment: 140,000 million yuan. Scope of construction: construction of a sanitation complex in Taihe Town in the southern part of the park, as well as a center for secondary sorting of domestic waste; in the northern part of the park, a project for converting waste into hydrogen will be built, along with supporting hydrogen refueling stations.

Zhanjiang Industrial Base for Converting Organic Waste into Hydrogen by Gasification, operated by Zhenpeng. Location: Zhanjiang. Total investment: 200,000 million yuan. Scope of construction: construction of a factory capable of producing 55,000 tons of green hydrogen and 83 tons of green liquid carbon dioxide per year, while also recovering copper, iron, aluminum, glass, sand and gravel, sulfur, nitrogen, chlorine, and heavy metals from waste materials
Reply #22026-01-31
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-01-31
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial production facility for the polyphase hydroformylation of ethylene using single-atom catalysts was put into operation between 2017 and 2020. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711445 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #42026-01-31
【Ten Years of Rapid Development in Chemical Equipment】The world’s first set of horizontal polycondensers for nylon 66, independently designed and manufactured by Tianhua Institute between 2026 and 2026, were successfully used in the 100,000-ton/year nylon 66 production facility at Liaoyang Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712094 (Source: Haichuan Chemical Forum (HCBBS))
Reply #52026-01-31
【Ten Years of Rapid Development in Chemical Equipment】The first domestically produced helium ionization chromatograph, model 2973-2025, has been officially delivered to the high-end polyolefin project at Blue Ocean New Materials. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711129 (Source: Haichuan Chemical Forum (HCBBS))
Reply #62026-01-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】CRRC Zhuzhou Institute’s 1000 m³ alkaline electrolyzers completed the industry’s first third-party long-term tests under fluctuating wind and solar conditions from 2030 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5712656 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #72026-01-31
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Inconsistent installation directions of pipeline bolts and excessive exposed length of the bolts https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711719 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #82026-01-31
【Ten Years of Rapid Development in Chemical Equipment】The Tianjin Bohua Safety Organic Liquid Hydrogen Storage and Release Demonstration Project, 2970–2025, has been successfully put into operation. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711046 (Source: Haichuan Chemical Forum (HCBBS))
Reply #92026-01-31
【Ten Years of Rapid Development in Chemical Engineering Equipment】Breakthrough achieved in China’s first offshore membrane carbon removal demonstration project: the associated gas recovery, carbon removal, and carbon dioxide sequestration project at the Huizhou 32-5 platform, 2982-2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5711847 (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.