Thread Content
Datang Dolun Plans to Use Biomass in Combustion Combined with Green Electricity to Produce Green Methanol 2026-03-18 13:27:22 On March 16, Zhongxin Nenghua launched a tender for feasibility study services and consulting services related to the certification of green methanol for a project that involves using biomass in conjunction with coal-based processes in coal chemical manufacturing to produce green methanol. Purchase Order Title: Feasibility Study for the Project of Producing Green Methanol through the Combustion of Biomass along with Coal in the Coal-based Processes of Sino-Singapore New Energy Chemicals in Dolun, along with Consultation Services for Green Methanol Certification – Competitive Bidding Process. Publication Date: 2026-03-16 21:41. Deadline for Submitting Quotes: 2026-03-19 17:00. Validity Period for Quotes: 2026-06-14. Procurement Method: Entrusted procurement. Purchasing Entity: Datang Inner Mongolia Dolun Coal Chemicals Co., Ltd. Procurement Agency: Materials Division of China Datang Group Corporation. The 150,000-kilowatt wind, solar, energy storage and hydrogen production project in Dolun has fully entered market-based operation. On November 20, 2025, China’s first demonstration project integrating green hydrogen with coal chemical processing, namely the 150,000-kilowatt wind, solar, energy storage and hydrogen production integrated demonstration project in Dolun, began full market-based operation, with the collaborative model of “producing hydrogen using green electricity and selling any excess electricity back to the grid” being successfully implemented. The 150,000-kilowatt integrated wind, solar, energy storage and hydrogen production demonstration project in Datang Duolun began construction in November 2023; after 14 months of work, it was completed. It was successfully connected to the power grid on January 17, 2025, and by May 2025 all 17 wind turbines had been connected to the grid, resulting in a 5% increase in the capacity for transmitting clean energy. The total investment in the project is approximately 1.3 billion yuan, and it will be funded and constructed by Datang Duolun Ruiyuan New Energy Co., Ltd., a wholly-owned subsidiary of Datang Group. Datang Group is a state-owned, large-scale energy enterprise under direct central government oversight, and it is one of China’s five major power groups. The new energy project is located near Honghuashan in Luanyuan Town, Tulun County, where a wind farm with a capacity of 120 MW, a photovoltaic power plant with a capacity of 30 MW, and an energy storage system with a capacity of 22.5 MW/45 MWh will be built. Once operational, it will generate 400 million kW•h of electricity per year, with over 20% of that electricity being fed back into the grid. The hydrogen production facility is located to the east of Datang Tuolun Coal Chemical Complex in the Tuolun County Economic Development Zone, covering an area of approximately 46,000 square meters. It is equipped with 14 sets of alkaline water electrolysis systems capable of producing hydrogen at a rate of 1,000 m³/h, as well as hydrogen storage tanks, hydrogen compressors, and chilled water units. The planned annual operating hours are 8,000 hours, with an expected annual hydrogen production volume of 70.59 million cubic meters. This will result in a reduction of 138,800 tons of carbon dioxide emissions; the environmental benefits equivalent to those achieved by 1,400 hectares of mature forest over one year. The green hydrogen it produces is supplied directly via pipelines to the methanol synthesis and polypropylene (PP) production units at the Tonglun Coal Chemical Plant, replacing traditional coal-based gray hydrogen with clean green hydrogen.
A true classic! ! ! The elbows subjected to prolonged liquid flow really take your breath away! ! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714477 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2030 to 2026, China’s first ultra-large-diameter (nominal diameter of 2000 millimeters) axial flow check valve successfully passed its practical application tests. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5715995 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2034 to 2026: Beijing Aerospace Power Research Institute’s first large-scale TO+RTO combustion unit designed independently began operating at full capacity successfully. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716014 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Special Topic on Safety Facility Design】Discussion Summary Post: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5714902 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Equipment Guessing Game】--What kind of device would have such a forest of valves? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716193 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【HaiChuan Equipment Guessing Game】==What a big ice cream! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716191 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2030 to 2026, China’s first fully domesticated, end-to-end industrial facility for producing 100,000 tons per year of POE (polyolefin elastomer) using the solution process has entered the commissioning phase at Tianjin Petrochemical. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716079 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】3050-2026: A period of 15 years! The world’s first polyether plant capable of stable operation at low temperature and pressure to produce 80,000 tons of carbon dioxide has been successfully put into operation. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716103 (Source: Haicun Chemical Industry Forum (Hua Haichuan Liu hcbbs))