Thread Content
On April 8, the green hydrogen-based ammonia synthesis and urea production project in Jiuyuan, Baotou, was approved for registration. Project owner: Nanjing Tianjia Energy Technology Co., Ltd. Location of construction: Jiuyuan District, Baotou City – Jiuyuan Industrial Park, Inner Mongolia, Baotou. Total investment: 453 million yuan, of which 90.6 million yuan comes from own funds, 362.4 million yuan is to be obtained through bank loans, and 0 million yuan from other sources. Planned start and completion dates: December 2026 to September 2028. Scale and scope of the project: With a total investment of 453 million yuan, the project will cover an area of approximately 100 mu, of which the production facilities are expected to occupy around 80 mu. Construction contents: include a 100,000-ton/year ammonia synthesis plant, liquid ammonia storage tanks, a 175,000-ton/year urea synthesis plant, a CCUS facility, an office building, and auxiliary facilities.
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2033 to 2026, China’s first pilot project for hydrogen-blended combustion in 660-megawatt coal-fired boilers achieved breakthroughs in both coal-hydrogen mixed combustion and pure hydrogen combustion. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717514 (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Incorrect Installation Direction of the Flange Cover on the Drain Valve of Storage Tanks https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717574 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
Hot isostatic pressing: One of the most advanced heat treatment and shaping technologies in the world. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717580 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The on-site facility for China’s first pilot project related to carbon capture, utilization, and storage as well as enhanced natural gas recovery (CCUS-EGR) in high-sulfur gas fields was successfully put into operation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717658 (Source: Haichuan Chemical Industry Forum (HCBBS))
【3D Process Flow】Summary Post – Xinjiang Zhundong’s 33.8-billion-yuan green hydrogen industry chain: the entire process from hydrogen production via wind and solar power to its use in chemical industries https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717774 (Source: Hchuan Chemical Industry Forum (Hchuanliu hcbbs))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Choosing the Sampling Point for Pressure Gauges Below Horizontal Pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717839 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3083-2026: SHENGU manufactures China’s first single-stage cantilever-type fully assembled centrifugal compressor https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717804 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Successful One-Time Commissioning of Lianyungang’s World’s First Process for Converting Light Hydrocarbons into Ethylene Glycol, 3085–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China National Petroleum’s first megawatt-class PEM hydrogen production system passed the authoritative CNAS testing and certification https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717958 (Source: Haichuan Chemical Industry Forum (HCBBS))