HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

With a total investment of 3.901 billion yuan, Nanjing Chengzhi will produce 60,000 tons per year of n-propanol and 200,000 tons per year of methyl derivatives

2026-04-17View Original

Thread Content

On the evening of April 15, Chengzhi Co., Ltd. announced that it plans to expand its chemical new materials industry chain around its core business. Through Nanjing Chengzhi New Materials Co., Ltd., a wholly-owned subsidiary of Nanjing Chengzhi Clean Energy Co., Ltd.—which in turn is a wholly-owned subsidiary of Chengzhi Co., Ltd.—the company will invest in and construct projects in the New Materials Science and Technology Park in Nanjing’s Jiangbei New Area. These projects include an extension of the ethylene value chain (producing 60,000 tons per year of n-propanol and 200,000 tons per year of methyl methacrylate (MMA)), as well as a project for producing high-end optical new materials (100,000 tons per year of polymethyl methacrylate (PMMA)). The total investment for these projects is estimated at approximately 3.901 billion yuan. The projected construction period for this project is 2.5 years; currently, it is in the pre-construction approval phase. The announcement states that the project aims to promote the diversification of the company’s products, extend the value chain of its existing ethylene-based products, enhance profitability, facilitate industrial upgrading, and strengthen the company’s core competitive advantages in the industry. At the same time, the construction of this project is in line with **industry policies; it can take advantage of the excellent resource advantages and favorable industrial ecosystem of the Nanjing Jiangbei New Materials Science and Technology Park in Jiangsu Province, thereby laying a solid foundation for the company’s sustainable and stable development. The project utilizes domestically produced ethylene and syngas as raw materials to build a propionaldehyde plant, which will further produce n-propanol, MMA, and PMMA. Upon commissioning, the project will help alleviate some of the pressure on Nanjing Chengzhi regarding the external sale of ethylene, reduce the price and supply risks associated with procuring propionaldehyde and MMA from outside sources, and hedge against price fluctuations of bulk raw materials such as ethylene and syngas. As a result, it will enhance profitability throughout the entire operational cycle and enable the plant to operate at high capacity. Additionally, the market cycles of n-propanol, MMA, and PMMA are not synchronized; therefore, this product portfolio helps to reduce overall profit fluctuations and effectively enhances the project’s risk resistance. At the same time, an integrated supply chain structure reduces intermediate trading steps, lowers logistics, warehousing, and funding costs, enhances the resilience of the supply chain, facilitates entry into high-end markets, and strengthens bargaining power against downstream customers. Basic information about the project
Project name: Implementation of the Ethylene Value Chain Extension and High-End Optical New Materials Project
Location: No. 208, Zhaoqiaohe Road, Changlu Subdistrict, Jiangbei New Area, Nanjing City

Construction content and scale: The scope of this project includes the construction of a combined plant for producing 200,000 tons/year of n-propanal and 60,000 tons/year of n-propanol; a 200,000-ton/year formaldehyde plant; a 200,000-ton/year MMA plant; and a 100,000-ton/year PMMA plant. Additionally, it involves storage and transportation facilities (including off-site piping, tank farms, and loading/unloading systems), flares, utility facilities such as water supply and drainage systems, packaging areas and automated warehouses, a central control room, an analytical building, and other auxiliary facilities. Investment amount: The total estimated investment for this project is 3.901 billion yuan (the exact amount shall be subject to the approval of the relevant authorities). Source of funds: Own funds and self-raised funds. Project progress: The construction period for this project is estimated to be 2.5 years, and it is currently in the preliminary approval stage.
Reply #22026-04-17
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to participate in the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705518 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #32026-04-18
【Ten Years of Rapid Development in Chemical Equipment】The Haiwang Hydrogen Energy Ningdong Organic Liquid Hydrogen Storage Materials Facility began trial production in 203088–2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718001 (Source: Huchuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #42026-04-18
【Haichuan Equipment Guess Game】 What’s that thing tied to the pipe? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718037 (Source: Haichuan Chemical Engineering Forum (Huahai Chuanliu hcbbs))
Reply #52026-04-18
【Ten Years of Rapid Development in Chemical Equipment】Successful One-Time Commissioning of Lianyungang’s World’s First Process for Converting Light Hydrocarbons into Ethylene Glycol, 3085–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5717840 (Source: Haichuan Chemical Forum (HCBBS))
Reply #62026-04-19
【HaiChuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #72026-04-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】3087-2026: China’s first offshore mobile multi-functional platform, “Zengchan No.1”, was delivered https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718136 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #82026-04-21
【Ten Years of Rapid Development in Chemical Engineering Equipment】3088-2026: China’s first demonstration project for producing high-quality synthetic crude oil using green hydrogen in combination with low-quality heavy oil has been launched. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718140 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #92026-04-21
【In-depth Discussion on Modular Installation of HaiChuan】The first module of China’s first cross-sea pipeline corridor project has been transported, lifted, and slid into place! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718213 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #102026-04-22
【Common Issues in Haichuan Pipeline Design】Selection of hoses and valves at the utility material hose stations, as well as details regarding piping and installation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718254 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #112026-04-22
【HaiChuan Safety Discussion】Hidden Dangers Around Us – No Toxic Gas Detectors Installed at the Sampling Points of Formaldehyde Production Units https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718279 (Source: HaiChuan Chemical Industry Forum (HuaHaiChuanLiu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.