The wastewater treatment facility supporting Shaanxi Coal Yulin Chemical’s 15 million tons per year demonstration project for the clean and efficient conversion of coal into various products – the largest coal chemical complex in the world – has been completed

2026-05-27View Original

Thread Content

Recently, the main structure of the biochemical tank for gasification wastewater within the sewage treatment facility associated with the 15-million-ton/year demonstration project on the clean and efficient conversion of coal by quality fractions, undertaken by Shaanxi Coal and Chemical Industry Yulin Chemical, was completed. This was achieved 46 days ahead of schedule. This wastewater treatment facility is the largest of its kind for coal chemical projects under construction worldwide. Located in the Yushen Qingshui Industrial Park in Yulin, Shaanxi, this facility is a core environmental protection supporting project for the overall project. The gasification sewage biochemical tank measures 179.2 meters in length, 144 meters in width, and 7.9 meters in height. Its total construction area is 25,776 square meters, with an effective volume of approximately 170,000 cubic meters. The designed treatment capacity is 2,000 cubic meters per hour. It consists of three process units: a sewage biochemical treatment unit, a sewage reuse unit, and an evaporation crystallization unit. The facility primarily employs a two-stage A/O advanced process to carry out biological carbon and nitrogen removal reactions within the tanks, and is designed to treat high-concentration, high-ammonia-nitrogen, and difficult-to-degrade gasification wastewater generated during operation. During the project construction phase, to ensure progress, the project team established a dedicated task force to coordinate and integrate resources from all parties, as well as to optimize the construction organization and the sequencing of various tasks ; For key aspects such as the construction of the main structure and the coordination of multi-disciplinary concurrent work, the construction plan is carefully reviewed repeatedly, and technical briefings are carried out at various levels ; Strictly implement grid-based on-site management, exercise tight control over key processes such as rebar and formwork use as well as concrete pouring. Strengthen quality control and safety supervision throughout the entire process, coordinate various factors including weather conditions and material supply, and make every effort to overcome construction challenges. While adhering to strict safety standards and ensuring high project quality, complete the topping-out of the main structure to a high standard. Once completed, the facility is expected to reduce annual COD (Chemical Oxygen Demand) emissions by approximately 20,000 tons and save over 35 million tons of water per year. It will help overcome the bottlenecks of high water consumption and severe pollution associated with coal chemical industries, thereby contributing to breaking through “water constraints” in the northwestern coal chemical industry base, as well as to the clean and efficient utilization of coal and the ecological protection of the Yellow River Basin.
Reply #22026-05-27
【Haichuan Equipment Guessing Game】Who caused these elbows to swell? ? ? ? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721796 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32026-05-27
【Haichuan Teahouse】Compilation Post on Wild Vegetables Series – Delicacies from the Rural Nature https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721742 (Source: Haichuan Chemicals Forum (Hua Haichuan Liu hcbbs))
Reply #42026-05-27
[HaiChuan Construction Drawing Review] Summary Post -- Understand the requirements for drawing review and improve standardized design. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721370 (Source: HaiChuan Chemical Forum (HaiChuan Chemical Flow hcbbs))
Reply #52026-05-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】World’s largest offshore converter station, 3138-2026, shipped to the Yangjiang sea area https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5721818 (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62026-05-28
【In-depth Discussion on Modular Installation for HaiChuan】--Modular lifting of the steel structure for large-scale dewatering tanks; all large-scale lifting operations for the closed coking removal project at Liaohe Petrochemical have been successfully completed! https://bbs.hcbbs.com/thread-5721906-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72026-05-28
[HaiChuan Safety Forum] Hidden hazards around us – The bending radius of explosion-proof flexible conduits does not meet requirements. https://bbs.hcbbs.com/thread-5721911-1-1.html (Source: HaiChuan Chemical Engineering Forum (HCBBS))
Reply #82026-05-29
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Unsealed or Plastically Sealed Extra Power Inlets in Explosion-Proof Electrical Equipment https://bbs.hcbbs.com/thread-5721992-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #92026-05-30
【Ten Years of Rapid Development in Chemical Equipment】The successful lifting of the 4,000-ton unit for China’s first large-scale low-temperature methanol washing plant, which utilizes fully domestic technology, from 2035 to 2026: http://bbs.hcbbs.com/thread-5721597-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #102026-05-30
【History of Haichuan Chemical】--Overview of the themes for “Safety Month campaigns” since the founding of the People’s Republic of China https://bbs.hcbbs.com/thread-5722041-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #112026-05-31
【Common Issues in Haichuan Pipeline Design】- Complete set of hand-drawn color illustrations from SH/T3012, the Standard for the Layout and Design of Metal Pipelines in the Petrochemical Industry, Section 07: Instruments and Measurement Elements https://bbs.hcbbs.com/thread-5721270-1-1.html (Source: Haichuan Chemical Engineering Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.