Project progress of Yulin Chemical Branch of China Shenhua Coal-to-Oil Chemical Co., Ltd

2015-06-15View Original

Thread Content

I work at a coal chemical company; the workplace is too far from my home, which is in Shaanxi. I want to work at Shenhua, but I’m not sure if they are hiring right now
Reply #22015-06-15
How is the project progressing? The news says construction just started in April
Reply #32015-06-15
No more hiring. By the end of June, the downstream projects for methanol-to-olefins had completed all intermediate handovers and entered the trial operation phase.
Reply #42015-06-15
You are referring to the Shenhua Yulin Circular Economy Coal Comprehensive Utilization Project in Shaanxi; the investment in this project is over 100 billion yuan. The foundation-laying ceremony for the project took place in April, and it is expected to be completed by 2019.
Reply #52015-06-15
Yes, it’s about investing over 100 billion in that
Reply #62015-06-15
There are many opportunities in this project, but the challenges are also great; it is necessary to reach world-class standards.
Reply #72015-06-15
I plan to go to Yulin tomorrow to take a look; I’m not sure if it will yield any results
Reply #82015-06-15
When the civil engineering phase begins, many people will need to get involved in the work (including land acquisition, contract documents, design drawings, etc.). At present, employees within the Shenhua group seem not to be able to be transferred freely; I’ll go and check it out tomorrow. Hopefully, we’ll get some results (let’s dream about it for now): lol
Reply #92015-06-15
It can be said that we are just entering the stages of selecting the process package and the overall design agency; these stages are mainly handled by senior experts and experienced employees, with the civil construction phase not beginning until next year.
Reply #102015-06-15
I’m looking at the displays for excavators and other equipment at night; heavy machinery has already arrived on site. It seems the ground is being leveled, with further construction work to come
Reply #112015-06-15
It was a foundation-laying ceremony that required various construction machinery to create momentum. If necessary, tanks can also be driven in.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.