HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Low-load hydrogen production operation

2015-06-22View Original

Thread Content

Ladies and gentlemen, if we need to produce 20,000 cubic meters of hydrogen, but only require 4,000 cubic meters of pure hydrogen as the product, how should we proceed?
Reply #22015-06-23
If hydrogen is to be produced via methanol cracking, the only options are to reduce the amount of methanol and the feed rate of the circulating liquid.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.