Is there a basis for the installation of manholes and access holes, and what is that basis?
The hand hole isn’t very clear; it’s probably used in small jars. Manholes located on the side of the container are equipped with vertical lids, while those on the top of the container use horizontal lids; those that need to be removed frequently can be fitted with quick-release manholes.
This post was last edited by ylb913 on 2015-7-1 17:11. Refer to page 22 of the Technical Specifications for Tower Design HG 20652-1998.
This post was last edited by zhangjuhua on 2015-7-1 22:19. I recall that the HG/T 20584 five-in-one standard mentions it as something based on experience, and it is of a recommendatory nature
The regulations on the structural design of chemical processing vessels, the old vessel standards, as well as standards for towers, horizontal vessels, and other similar devices all contain relevant provisions
Refer to page 440 of HG/T20583-2011, 8. Manholes, handholes, inspection holes.
The new horizontal containers also specify that when L exceeds 8m, the number of manholes should not be less than 2
Detailed explanations are available in the Fixed Volume Gauge and the 6-in-1 version
Let’s go with this standard process; the conditions do not meet the requirements of 20583. Let him know about it, and if he doesn’t make any changes, we’ll follow their requirements
Inspections, repairs, shutdown checks, etc., are determined as needed. Generally, it is the owner who puts forward some requirements.