What measures should be taken for long-term shutdown of liquefied gas pipelines?

2015-07-17View Original

Thread Content

What measures should be taken for long-term shutdown of liquefied gas pipelines?
Reply #22015-07-17
In the case of long-term parking, the liquefied gas is transferred to the oil storage area, nitrogen is used for purging until the conditions are satisfactory, and a slight positive pressure is maintained.
Reply #32015-07-18
Drain the liquid level, then purge with water and steam
Reply #42015-07-18
Since it’s for a long period of time, it’s best to fill it with nitrogen to maintain some pressure.
Reply #52015-07-20
Nitrogen isolation is an important step, and attention must also be paid to dehydration in the lower areas!
Reply #62015-07-21
Liquid and gas pipelines: material removal, purge to ensure compliance, isolation using blind flanges, labeling, dehydration at the lowest points, nitrogen filling to maintain a slight positive pressure; regular checks on pressure and condensate levels at the lowest points. The purpose is to prevent long-term corrosion.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.