2015-08-08View Original

Thread Content

The last edit to this post was made by hesonchang214 on 2015-8-31 at 10:08. The finished structural design files I’ve seen all lack a material summary table; so how can material usage be controlled during procurement and construction in such cases?
Reply #22015-08-08
The last edit to this post was made by hesonchang214 on 2015-8-31 at 10:10. Then have the construction party conduct on-site material counting and send it to you!
Reply #32015-08-10
This post was last edited by hesonchang214 on 2015-8-31 at 10:09. In civil construction, the work and materials are usually provided as a package, so there are hardly any materials supplied by the client; instead, the construction supervisor selects the materials, which are then purchased
Reply #42015-08-31
Some materials are specified by the client, while most are purchased by the contractor!
Reply #52015-08-31
Generally, the quantity of materials is first determined by the construction supervisor after reviewing the drawings.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.